Engineering Surveying Course Taught to Civil Engineering Students in KSA Universities A Case Study of Albaha University IJTSRD
Surveying course is one of the fundamental subjects that involved in academic plan of most civil engineering programs. It generally covers topic that concerned with mapping, setting out, earthwork, and design. The course title differs from one program to another. It may appear under the name of surveying, mapping techniques or geomatic. Surveying is applicable […]
Study on Building Structures with Sloping Ground under Seismic and Wind Load Conditions IJTSRD
Analysis and design of space building frame for seismic loading and wind pressure is very essential these days because construction of high rise buildings. It is also necessary to construct an economic and more durable structure. It is possible by availability of various software and specialized programs. By using these software we can design a […]
Tyre Rubber Modified Bitumen For Ashpalt Mixture IJTSRD
Every nation depends upon exports and imports of goods and services. These goods and services are majorly done by the road ways. The idea of utilizing of Crumb rubber and glass fiber to enhance the properties and pavement performance of the selected asphalt mixtures. Crumb rubber and glass fiber with an additive dosage rate of […]
Analytical Study of Natural Light and Ventilation in Admistrative Building of PCNTDA, Pune Region IJTSRD
As one of the significant parts in the building design, use of natural light and ventilation which reflects one important factor of energy conservation to some extent. To ensure that decreasing use of energy resources to the maximum extent in constructions and make buildings harmonize with their surroundings, which has become important pursuing for inhabited […]
Investigation on the Existing Geometry of Pathein Suspension Bridge IJTSRD
Pathein Suspension Bridge constructed across Pathein River completed in 2004 is a single-span suspension bridge. The region has soft alluvial ground. According to 2012 bridge inspection report, Current Situation and Issues of Myanmars Bridge Work, this suspension bridge had lost a great deal of camber since completion. And also it is found that there are […]